Scope of Work
Twin Valley Behavioral Health Hospital is a two story, 270,000 sq. ft. new build, projected to complete by fall 2023. This new facility will include 208 beds arranged in eight patient units, with associated staff and patient support areas, a cafeteria, recreation areas, and office space.
As the electrical and teledata contractor, we installed 4,700 light fixtures, 383,000 feet of conduit, 1,681,000 feet of wire, over 8,600 devices, fire alarm, and other systems, as well as (2) 1500 kw generators, (1) 5,000 amp paralleling gear, and (1) double-ended 15kv 4,000 amp main substation.